Palisadian Rebuilding resources →
Pacific Palisades · Parcel by Parcel

Rebuild Map

Mapped parcels in Pacific Palisades (ZIP code 90272), colored by rebuild progress — compiled from Los Angeles County damage records and City of LA (LADBS) building-permit records. Click any parcel for its status. Drag the timeline to watch the rebuild spread.

Latest public records Loading map data… Updated weekly
—Destroyed / major damage · parcels
—Destroyed / major · single-family parcels
—Parcels in rebuild plan check
—Parcels with rebuild approval
—Parcels under construction
—Completed main-building parcels
—Parcels with repair / remodel permits

Every tile counts assessed parcels in ZIP code 90272. The single-family count is included in the damage total; damage totals also overlap work-status counts, so do not add all the tiles together. Completed means main-building work has a finaled permit or certificate; an ADU or garage certificate alone does not establish completion. See what each number means and why the City’s certificate and address totals differ.

Interactive parcel map

Explore rebuild activity

Loading parcel data
Map keyRebuild status
No rebuild permit found
In plan check
Plans / permits approved
Under construction
Rebuilt / finaled
Campus reopened / in use
Repair / remodel
Minor damage
No recorded damage
Status / assessment needs review
palisadian.com
Rebuild timelineDrag to view recorded progress; totals show latest data
today
i

About this map. Built from public records: parcel boundaries and structure-damage assessments from Los Angeles County (CAL FIRE DINS), and building-permit records from the Los Angeles Department of Building and Safety permit, application, inspection and occupancy records, checked against live city permit reports. Totals cover mapped assessment parcels in ZIP code 90272. The destroyed/major-damage figure counts parcels of every property type, including separately assessed condos and commercial sites; it is not a count of houses or structures. Documented field corrections are retained. Community-reported lot combinations use approximate display boundaries; totals retain County assessment parcels. A rebuild application, an issued main-building permit, a recorded construction inspection, and a finaled permit or issued Certificate of Occupancy are separate stages. School construction approvals from the Division of the State Architect (DSA) appear in parcel details alongside City records. Dated community site reports may identify active school construction; these are shown separately from City inspections. Plan approval and ongoing campus restoration do not establish completion of new school buildings. Campus reopening is shown separately from finaled rebuilding and may include interim facilities while permanent work continues. ADU-only and accessory-building work do not establish main-home completion. Scheduled or cancelled inspections do not establish construction. Power markers show city Service/Power Release approval, including conditional approval; utility energization is not confirmed. Gas-test approvals appear in property details; they do not confirm active gas service. City records can lag on-site work. Parcel snapshot: — · Permit records through: —. Individual community use is welcome; automated extraction and substantial republication are not. Map data terms.